Last updated:
You pressed order, and an hour later you saw it. The name has two letters swapped, or the hoodie should have been an XL, or the parcel is headed to your old apartment. You have 24 hours from placing the order to cancel it or change it. This page explains how to do that, what can be changed, what cannot, and what your options are once the 24 hours have gone.
Cancellations and changes at a glance
- Window: cancel or change an order within 24 hours of placing it.
- How: email support@milestee.shop with your order number and the exact change.
- What can change: name, year, distance, finish time, size, colour, quantity and delivery address.
- Refund for a cancellation: refunded to the original payment method.
- After 24 hours: the order goes ahead as placed. You can return it within 60 days from delivery, and a refund follows within 7 days of receiving the return.
- Our reply: within 24 hours on business days.
1. The 24-hour window
The window opens the moment your order is placed and closes 24 hours later. Inside it, a cancellation or a change is free.
Why it is 24 hours
Every piece is made to order. Making takes 1–3 business days, and it starts early. Once your name is printed on a tee, that tee cannot become anyone else’s. The 24 hours are the stretch in which your order is still only words on a screen, which is when words are easy to fix.
Why the window matters more here than in most shops
We do not send a proof. Nothing is emailed for approval before production, and we print exactly what was typed. The drawing on the product page shows your text before you order, and it is the only check there is. So read your order confirmation email as soon as it arrives. Read it the way you would check a bib number at packet pickup: slowly, one character at a time.
2. How to ask for a change or a cancellation
- Find your order number. It is in the confirmation email and, if you ordered with an account, under My Account.
- Email us straight away. Use the order change email link or the cancellation email link. Both open a message to support with the subject filled in. The Submit a Ticket page lists the same links by topic.
- Say exactly what you want. For a cancellation, write that you want the whole order cancelled, or name the piece to remove. For a change, give the old value and the new one, as in the examples in section 3.
- Type new text the way it should print. Capitals, spacing and colons included. We copy it across character for character.
- Look for our reply. We answer within 24 hours on business days and confirm in writing what was changed or cancelled.
Send the email as soon as you notice. Do not hold it until Monday because it is the weekend, and do not wait until you have decided on every detail. A message that says “please hold order 1234, the name is wrong, details to follow” is better than a perfect one sent a day late.
3. What you can change
| What to change | What to write | Good to know |
|---|---|---|
| Name | The correct name, typed as it should print | Up to 16 characters |
| Race year | The four-digit year | Worth a second look on orders placed around New Year |
| Distance | 5K, 10K, 13.1 or 26.2 | These are the four distances offered. Hats carry the distance only |
| Finish time | The time as H:MM:SS, or MM:SS for a short race, or “remove the time” | The time is optional. The design is complete without it |
| Size | The size ordered and the size wanted | 2XL–3XL cost $2 more and 4XL–5XL cost $4 more than S–XL |
| Colour | The colour ordered and the colour wanted | Choose from the colours shown on that product page |
| Quantity | Which piece and how many | You can also remove one piece and leave the rest in place |
| Delivery address | The full correct address | We deliver to the US, Canada, Australia and New Zealand |
A typo in the name, noticed an hour later
You ordered a Race Day Name Tee for your brother, and the confirmation email says Teho where it should say Theo. An hour has passed and you are well inside the window. Email us with the order number and write: name should be Theo, capital T, lower case h-e-o. We correct it and confirm. The tee is then printed with the right name, and the mistake never leaves the screen.
The time typed with full stops
The finish time field expects H:MM:SS, or MM:SS for a short race. A common slip is typing 2.04.36 when you meant 2:04:36. We print what is typed, so without a correction the sweatshirt would carry the full stops. Inside 24 hours, send us the time in the right format and it is fixed. The same goes for a time typed as 28.41 that should read 28:41.
Adding or removing the time
You can add a finish time to an order that had none, or take one off, as long as you ask within 24 hours of ordering. This helps when a race falls inside the window. Order the finisher mug the evening before, run in the morning, and email the chip time before the 24 hours are up. If the race is further off than that, order with the time left blank, or order after the race. A time cannot be added to a piece once it is printed.
Changing a size across a price line
Moving from an L to a 2XL adds $2, and moving from an XL to a 4XL adds $4. Moving down takes the same amounts off. We tell you the difference before the change is made, and nothing extra is charged without your agreement. If you are unsure which size to move to, the Size Guide has the flat measurements.
4. What we cannot change or add
Some requests arrive inside the window and still cannot be met. It is better to know them now.
- A race name, event logo, city skyline or sponsor. We are sometimes asked to add the name of the race under the distance. We do not print it, on any piece, at any stage. Race names and logos belong to the people who organise the events. What we print is yours alone: your name, the distance you ran, the year and, if you want it, your time. It also means the same tee works for a local 5K, a turkey trot or a marathon.
- A proof before printing. We cannot send one, even on request. Check the drawing on the product page and your confirmation email.
- Typed text on a hat. Hats are embroidered with the distance only.
- A finish time on the Race Day Name Tee or the Custom Finisher Ornament. The tee takes a name and an optional year. The ornament takes a name and a year.
- A name longer than 16 characters. The limit is fixed.
- A delivery address outside the four countries we serve.
We also do not verify anything you type. If you ask us to change a time, we change it to what you send. We never look up race results, so the accuracy of the time is between you and the clock.
5. After the 24 hours
Once 24 hours have passed, the order goes ahead as it was placed. If you find a problem after that point, write to us anyway with your order number. We will tell you where the order stands and what can still be done.
If the piece has already been made, you still have a way out. Every piece, personalised ones included, can be returned within 60 days from delivery. For a change of mind we pay the return postage with a free return label. So the worst case for a late-spotted typo is this: the piece arrives, you send it back at no cost, and you order a corrected one. The steps are on the Returns & Exchanges page.
| Stage | Cancel | Change | What to do |
|---|---|---|---|
| Within 24 hours of placing the order | Yes, free | Yes, free | Email us with the order number and the exact request |
| After 24 hours, order not yet shipped | Ask us | Ask us | Write to us and we will tell you where the order stands |
| Shipped and on its way | No | No | Wait for delivery, then start a return if you need one |
| Delivered | No | No | Return within 60 days from delivery |
6. If the order has already shipped
You will know an order has shipped because tracking details are emailed when it does. From that point the parcel is out of our hands and cannot be cancelled or edited. Let it arrive. If it is not right, start a return within 60 days from delivery.
If the problem is the address, for example a parcel on its way to a place you have moved out of, contact us with your order number and we will help. Delivery times and what happens with a parcel that goes astray are covered on Shipping & Delivery.
7. Refunds
For a cancellation: your order is refunded to the original payment method.
For a piece you return after delivery: the refund is sent within 7 days of receiving the return, to the original payment method.
If you remove one piece from a larger order within the 24 hours, the amount paid for that piece is refunded to the original payment method and the rest of the order carries on. If a change lowers the price, such as a 3XL changed to an XL, the difference goes back the same way. Shipping is free on every order, so there is no shipping charge to work out in any of these cases. The full detail on amounts is in the Refund Policy.
8. A gift order placed before the race
Buyers sometimes cancel because they think an order cannot be right without a finish time. Take the partner who orders a finisher sweatshirt two weeks before a first half marathon. A day later the worry arrives: there is no time on it, so is it unfinished? It is not. Maya · 13.1 · 2026 is a complete design. There is no need to cancel and wait for the result. If the runner wants the time on something afterwards, a second piece such as a mug can carry it once the race is run.
If you would still rather wait, cancel within the 24 hours and come back after race day. Either way works, and neither costs you anything.
9. Short answers
Can I swap a tee for a hoodie inside the 24 hours?
Yes. Ask us to cancel the tee, then order the hoodie from the shop as a new order. The cancelled piece is refunded to the original payment method.
I ordered on Saturday night. Does the window wait for Monday?
No. The 24 hours run from the moment the order is placed, weekend or not. Send your email inside them.
I sent a change and then spotted a second mistake. What now?
Reply on the same email thread with the second correction, so both sit together with your order number.
10. Contact us
For anything about an order you have just placed, email support@milestee.shop with your order number. Email is the only way to reach us, and we reply within 24 hours on business days. To see how order statuses are described, visit Order Tracking. For short answers on personalisation, see the FAQs.
Miles Tee, 53 Juicy Grape Ct, Martinsburg, WV 25403, US.